How to factory order a Jeep Wrangler, Gladiator or Ford Bronco

You do not have to take what is on the lot. Any Jeep or Ford dealer can send your exact build to the factory, and the factory does not charge extra for it. Here is how an order works step by step, how long it runs, how to follow it, and what can change along the way.

First decision

Order it, or buy one off the lot?

Both are good ways to buy. Which one fits depends on how particular the build is and how soon you need it.

Ordering fits when
You want a particular combination, such as a two-door, a manual, a certain top, axle ratio or color, and you can wait two to three months for it.
The lot fits when
You need the vehicle soon, something in stock is close to your build, or the maker is putting its better offers on vehicles already built.

How it works

Seven steps, from the build to the driveway

The steps are the same for a Wrangler, a Gladiator and a Bronco. Only the names of the paperwork change.

  1. Step 1

    Build it, then check it against the dealer’s order guide

    Use Build & Price on jeep.com or ford.com to work out the trim, engine, top, packages and color, and print the summary. Around a model-year change the public site can run behind what a dealer can actually order, so have the dealer check your build against the current order guide.

  2. Step 2

    Pick the dealer, and ask about allocation

    Every order goes through an authorized dealer; neither Jeep nor Ford takes a retail order direct. The factory allots each dealer a share of what it builds, so the same build can be scheduled sooner at one store than at another. Ask how soon the dealer expects an order like yours to be scheduled.

  3. Step 3

    Settle the price before the order goes in

    The factory does not charge more for an ordered vehicle. The price is between you and the dealer, so agree on it first and get it in writing as an out-the-door number. Ask whether that price holds if the sticker price goes up before yours is built. A dealer may ask for a deposit; ask whether it is refundable and get that in writing too.

  4. Step 4

    Get the paperwork, by name

    At Jeep, ask for the order confirmation owners call a POC. It shows the Vehicle Order Number, or VON, and every option code. At Ford, ask for the order summary, which owners still call a DORA. It shows the order number and a priority code. A 99 means do not build, so make sure yours is not a 99. Have the dealer put your own email address on a Ford order so Ford’s updates come to you. Read every line against your build.

  5. Step 5

    Wait for the factory to schedule it

    The order waits until the factory schedules it. A VIN is assigned when the schedule is firm. A Jeep order moves through status codes from there; Ford emails a build week.

  6. Step 6

    Built, then shipped

    Wranglers and Gladiators are built in Toledo, Ohio. The Bronco is built at Michigan Assembly Plant in Wayne, Michigan. From there the vehicle travels by rail, truck or both to the dealer.

  7. Step 7

    Check it against the order before you sign

    When it arrives the dealer preps it. Read the window sticker against your order sheet line by line, look the vehicle over for shipping damage, and confirm the price matches what you agreed in writing, all before any paperwork.

Plan on two to three months, and treat the date as an estimate.

Dealers commonly quote eight to twelve weeks from order to delivery. Real orders run both ways. One Wrangler owner ordered on May 1 and took delivery on June 22. A 2026 Bronco buyer who ordered in June reported the wait growing from about 90 days to past 150.

What stretches it: a dealer short on allocation, an option the factory is holding, an order placed right at a model-year change, and on a Jeep, factory add-ons that send the finished vehicle to an outside shop before it ships.

8–12Weeks dealers commonly quote, order to delivery
$0Extra the factory charges for an ordered vehicle
99The Ford priority code that means do not build
JBThe Jeep code for a stop at an outside shop, which adds time

Following the order

Jeep and Ford, side by side

How a factory order is placed and tracked at Jeep and at Ford
Jeep Wrangler and GladiatorFord Bronco
Where the order goes inAny authorized Jeep dealerAny authorized Ford dealer
The number you getVehicle Order Number (VON), then a VIN once it is scheduledOrder number by email, then a VIN once it is scheduled
Where to follow itJeep’s Track Your Order page, or the dealer, who can read the status codeFord’s Vehicle Order Tracking page, with the order number and the VIN, plus emails from Ford as the build moves
The paper to ask forThe order confirmation, called a POCThe order summary, still called a DORA
A sign it is closeThe status moves into the shipping codesThe window sticker shows up online; owners report that happens about a week before assembly starts

Jeep status codes

What the dealer’s screen is telling you

A Jeep order carries a short status code that changes as it moves. Jeep’s public tracker shows only some of them. The dealer’s screen shows them all, and the dealer can read you the current one.

BA
The dealer has entered the order.
BE
An entry error has to be corrected before the order can be scheduled.
BX
A good order, ready to be scheduled.
C
Tentative schedule.
D
Firm schedule. The VIN is assigned.
D1
At the gate: placed in line for production.
E, F, G
Being built: frame, then paint, then trim.
I and J
Built, and going through or past final inspection.
JB
Sent to an outside shop for add-ons such as a spray-in bedliner, side steps or decals. This stop adds time.
JS
Shipped to storage, waiting on transport.
KZ
Released by the plant and invoiced. Letters after KZ follow it by rail.
KZX
Delivered to the dealer.

What can change

Eight things that move while you wait

None of them is a reason not to order. They are reasons to ask a few questions first.

The build
Ford says no changes can be made once an order is scheduled for production. A Jeep order gets hard to change at the same point. Ask the dealer how late a change can still be made.
The build week
It can move up or back. Ford owners report schedule-change emails arriving in the middle of the wait.
The sticker price
A maker can raise prices during the model year. Ask whether your agreed price is protected if that happens, and get the answer in writing.
Rebates
Factory offers vary by ZIP code and change through the year. Ask which ones apply to an order, and whether they are set on the day you order or the day you take delivery.
The model year
Order banks close when one model year ends and open again for the next. Ask what happens to your order, and your price, if it is not built before the changeover.
An option on hold
Now and then the factory holds orders with a certain option. The dealer can see the hold. You can wait it out or change the option.
Your loan rate
A lender’s rate approval usually runs out before a two-to-three-month order arrives. Plan to settle the loan close to delivery.
Your trade-in
Expect it to be appraised when the new vehicle arrives, not on order day. Ask the dealer how they handle it.

Before the order goes in

Nine questions to ask the dealer

  1. What is the out-the-door price, in writing, for this exact build?
  2. Does that price hold if the sticker price goes up before it is built?
  3. How soon do you expect this order to be scheduled?
  4. Is the deposit refundable, and where does it say so?
  5. When will I get a copy of the order sheet with the order number on it?
  6. Which rebates apply, and are they set at order or at delivery?
  7. What happens to the order and the price if the model year changes first?
  8. Will my trade-in be appraised now or at delivery?
  9. Who updates me while it is being built, and how often?

Questions

Straight answers

Does it cost more to factory order a Jeep or a Bronco?

No. Neither maker adds a charge for an ordered vehicle. The price is set between you and the dealer when the order is placed.

How long does a factory order take?

Dealers commonly quote eight to twelve weeks from order to delivery. It can run shorter or a good deal longer, and the build week can move, so treat any date as an estimate.

What if the price goes up while I wait?

Ask before you order. Some orders are protected against a price increase during the model year and some are not. Get the dealer’s answer in writing.

Do I have to buy it when it arrives?

That depends on what you signed. The deposit agreement and your state’s law decide it, so read the terms before you put money down.

When do I arrange the loan and the trade-in?

Close to delivery, as a rule. A lender’s rate approval usually runs out before the vehicle arrives, and most dealers appraise a trade-in when the new one is ready.

How do I track a Jeep Wrangler or Gladiator order?

Use Jeep’s Track Your Order page with the order details from the dealer, or ask the dealer for the current status code. The dealer’s screen shows more than the public page.

How do I track a Ford Bronco order?

Use Ford’s Vehicle Order Tracking page with the order number and VIN. Ford also emails as the build is scheduled, built and shipped.

What does JB mean on a Jeep order?

The finished vehicle has gone to an outside shop for add-ons such as a spray-in bedliner, side steps or decals before it ships to the dealer. It adds time.

Can I change the order after it is placed?

Only early. Ford says no changes can be made once the order is scheduled for production, and a Jeep order gets hard to change at the same point.

Ready with a build? Fill in the order sheet, or see what is new for 2027 before you choose.

OffRoad.guide · Open all year

Half a day on the sand. Then the price, in writing.

Request your date

$325 a vehicle for the full five and a half hours, any month of the year. Request a date on the main page to get first pick. We email you to confirm it, with the booking link and the online license and insurance check. Questions? Email hello@offroad.guide; answers come back the same day.

How it works

Keys at the Hilton Garden Inn in Kitty Hawk, half a day up North Carolina Highway 12 and the Carova 4x4 beach, your family along and no salesperson. Then the No-Haggle Price in writing. The whole experience, start to finish.

Shopping with someone?

Send them this page.